Project · OCP Group
OCP Group | JESA — Khouribga
Addressable detection, gas extinguishing and pumping station
Client
OCP Group | JESA
Location
Khouribga, Morocco
Services
Engineering, supply, installation, testing, commissioning, maintenance
Background
At the OCP Khouribga site, Ondoan Maroc deployed complete fire protection solutions, from engineering through to maintenance. Every stage was carried out in accordance with international standards, to safeguard people, protect the installations and maintain business continuity.
What we delivered
From design study to commissioning
The project in pictures
Areas covered
Addressable detectionGas extinguishingFire water networkPumping stationFire hose reelsElectrical worksTesting and maintenance





